Power Systems & Energy Planning

System modeling, integrated resource planning and grid-integration analysis that tells clients what the system will actually allow.

The problem

A capacity, renewable-integration or adequacy decision needs a defensible technical evidence base — not an assumption.

A capacity or adequacy decision is usually made long before anyone checks whether the system can carry it. Targets are set against ambition, procurement follows the target, and the network is asked to absorb the result afterwards.

By the time the constraint surfaces it is expensive. A connection queue that will not clear, a curtailment assumption that was never tested, an adequacy margin that holds on average and fails in the hours that matter. None of these are analytical mistakes — they are the consequence of deciding first and modelling second.

How we work

We start from what the system allows rather than from what the target requires, and build the evidence base in the order a decision has to survive: what the network can carry, where the binding constraints sit, what those constraints cost, and only then which pathway is least-cost.

Scenarios are built to be interrogated, not presented. A planning case that cannot be re-run under different assumptions is a snapshot, and snapshots do not survive the years between a decision and its consequences.

  • Integrated resource and system-scenario planning
  • Renewable and storage integration analysis
  • Grid-constraint and loss diagnostics
  • Dispatch and system-economics modeling

How this discipline thinks

FIRMVARIABLELOADGAPThe gap is met by imports, storage, flexibility — or it is not met.

Key questions answered

  1. 01What does the system allow, under which scenarios?
  2. 02Where are the binding constraints, and what do they cost?
  3. 03What is the least-cost pathway to the target?

Typical deliverables

A scenario model documented well enough that the client can re-run it, a constraint diagnostic that names what binds and what it costs, and a planning report written to be defended.

  • Scenario model, documented and transferable
  • System-constraint diagnostic
  • Planning report

Who does this work

Shend Boshnjaku

Founder & CEO

Energy systems, power-system planning, policy and transition strategy across Kosovo, the Western Balkans and the United States.

  • Power Systems
  • Policy
  • Modeling
  • Energy Efficiency

Discuss a power systems & energy planning assignment

Tell us the context, timeline and decision you're working toward.

Start a conversation

We reply within two business days.