A project needs to reach bankability and survive connection, permitting and structural reality.

Who this is for
Developers, municipalities, public institutions, investors, EPCs
Indicative duration
Typically 4–10 weeks for a single site; longer for a portfolio

The decision this supports

Whether to spend the next tranche on this project, and which single obstacle to clear before you do.

What is included

  • Technical screening
  • PV / storage analysis
  • Grid and connection risk assessment
  • Structural and electrical feasibility, where relevant
  • Project economics
  • Permitting and implementation pathway

What we need from you

  • Site location and land control status — ownership, lease or option
  • Intended capacity and any existing layout or yield study
  • Connection correspondence with the network operator, including refusals
  • Permitting steps completed so far, and what is outstanding
  • For rooftops, the structural drawings or the age and type of construction

What you receive

  • Readiness scored across six dimensions, with the binding constraint named
  • Yield and project economics under your own financing assumptions, not generic ones
  • Connection risk assessed against how the network operator actually behaves
  • A permitting and implementation pathway with the sequence that applies to this site
  • A written answer on what to fix first, and what it is reasonable to spend to fix it

Where this sits in a project's life

Fig. 01Where this engagement sits in a project's lifecontent/engagements.ts — real engagement scope
Coverage & methodProject-lifecycle demonstration
Illustrative
  1. 01
    Opportunity
  2. 02
    Site screeningTechnical screeningKreshnik Boshnjaku
  3. 03
    Regulatory / permittingPermitting & implementation pathway
  4. 04
    Grid / systemGrid & connection risk assessment
  5. 05
    Technical feasibilityPV / storage, structural & electrical feasibilityKreshnik Boshnjaku · Dr. Bledian Nela
  6. 06
    EconomicsProject economicsShend Boshnjaku
  7. 07
    Investment readiness
  8. 08
    Delivery
  9. 09
    Operation
FlowOps leadsFlowOps analyses / advisesSpecialist / partner inputClient / authority decision

The stage sequence is illustrative. The contribution mapping is not — every stage marked “FlowOps leads” or “analyses and advises” corresponds to an item in this engagement’s stated scope.

What you can do afterwards

Commit the next tranche of spend against a named constraint, or stop early — before a study budget is spent on a project the connection will not carry.

What usually happens next

Typically tender or EPC support, lender-facing technical documentation, or re-running the assessment once the binding constraint has moved.

Evidence

One record, chosen for this engagement and labelled by who held the contract. It is evidence of method, not a claim that this engagement produced it.

This page is available in English and Albanian. If you identify an inconsistency between the language versions, please contact FlowOps Energy.